{"id":7801,"date":"2010-11-25T22:33:30","date_gmt":"2010-11-25T21:33:30","guid":{"rendered":"https:\/\/ljportal.com\/arhiva\/2010\/11\/25\/u-planu-je-skora-realizacija-oko-500-mini-hidroelektrana-u-bih\/"},"modified":"2010-11-25T22:33:30","modified_gmt":"2010-11-25T21:33:30","slug":"u-planu-je-skora-realizacija-oko-500-mini-hidroelektrana-u-bih","status":"publish","type":"post","link":"https:\/\/ljportal.com\/arhiva\/u-planu-je-skora-realizacija-oko-500-mini-hidroelektrana-u-bih\/","title":{"rendered":"U planu je skora realizacija oko 500 mini-hidroelektrana u BiH"},"content":{"rendered":"<div style=\"text-align: justify;\" \/><img loading=\"lazy\" decoding=\"async\" class=\" alignleft size-full wp-image-7800\" style=\"margin-top: 3px; margin-right: 6px; float: left;\" alt=\"mhe_rijeka\" src=\"https:\/\/ljportal.com\/arhiva\/wp-content\/uploads\/2010\/11\/novo_jesen_mhe_rijeka.gif\" height=\"113\" width=\"150\" srcset=\"https:\/\/ljportal.com\/arhiva\/wp-content\/uploads\/2010\/11\/novo_jesen_mhe_rijeka.gif 150w, https:\/\/ljportal.com\/arhiva\/wp-content\/uploads\/2010\/11\/novo_jesen_mhe_rijeka-80x60.gif 80w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/>Posljednjih je godina u Bosni i Hercegovini prava ekspanzija mini hidroelektrana od kojih su neke u postupku projektiranja, drugima se dodjeljuju koncesije, a tre\u0107i su opet u procesu izgradnje. Prema nepotpunim podacima u planu je realizacija oko pet stotina mHE diljem BiH.   <\/p>\n<p>Ilustracije radi, samo na teritoriju op\u0107ine Konjic na pritokama Neretve planira se izgradnja 40 mini HE.<\/p>\n<p>Ne postoji strogo odre\u0111ena definicija o klasifikaciji mHE osim ona koja se izra\u017eava u snazi elektrane. Prema relevantnoj literaturi, ali i prema doma\u0107em zakonodavstvu (s gledi\u0161ta razine nadle\u017ene vlasti), naj\u010de\u0161\u0107e se spominje granica do 5 MW. Ispod te granice su mini hidroelektrane, a iznad ove razine snage elektrane se podrazumijevaju velike hidroelektrane.<\/p>\n<p>Vlada Federacije BiH i Ministarstvo energetike, rudarstva i industrije donijelo je prioritet u izgradnji energetskih objekata u Federaciji BiH. Prema Katalogu projekata, prioritet je dan na izgradnju 25 mHE, od kojih \u0107e 15 koristiti Elektroprivreda BiH Sarajevo te 10 Elektroprivreda HZ HB Mostar. Sve mHE koje \u0107e graditi Elektroprivreda BiH nalaze se na slivu rijeke Neretvice. U fazi I. su \u010detiri mHE Neretvica, ukupne instalirane snage od 11.152 kW, koje \u0107e godi\u0161nje u sustav isporu\u010divati 43.484 MWh elektri\u010dne energije.<\/p>\n<p>U drugoj fazi je pet mHE ukupno instalirane snage 7.866 kW a koje \u0107e svake godine proizvoditi 32.538 MWh elektri\u010dne struje. U tre\u0107oj fazi je \u0161est mHE ukupne snage 7.205 kW , s godi\u0161njom proizvodnjom od 26.122 MWh energije. Kada svi radovi budu zavr\u0161eni, zaslugom mHE, sustav Elektroprivrede BiH bit \u0107e sna\u017eniji za 27 223 kW, a potro\u0161a\u010dima \u0107e biti godi\u0161nje ponu\u0111eno dodatnih 102 144 MWh elektri\u010dne energije.<\/p>\n<p>Na slivu rijeke Cetine, na prostorima op\u0107ina Tomislavgrad i Kupres, Elektroprivreda HZ HB planira izgraditi tri mHE. Ukupna instalirana snaga sve tri iznosit \u0107e 13,071MW, a godi\u0161nje \u0107e isporu\u010divati 32,678 GWh elektri\u010dne energije. Na rijekama Tihaljina, Mlade i Trebi\u017eat, u op\u0107inama Grude, Ljubu\u0161ki i \u010capljina, bit \u0107e izgra\u0111eno 5 mHE. Ove mHE imat \u0107e ukupnu snagu 19,788 MW a godi\u0161nje \u0107e proizvoditi 77,18 GWh energije. Jo\u0161 dvije ovakve mHE bit \u0107e izgra\u0111ene na slivu rijeke Li\u0161tice i Mlade, op\u0107ina \u0160iroki Brijeg i Ljubu\u0161ki. Ukupna snaga ovog sustava iznosit \u0107e 7,09 MW, a godi\u0161nje \u0107e proizvoditi 17,80 GWh struje. Ovim sustavima mini hidroelektrana, Elektroprivreda HZ HB \u0107e poja\u010dati sustav za 40,749 MW a svake godine na raspolaganju \u0107e imati i 127,658 GW sati energije.<\/div>\n<p> <\/p>\n<div style=\"text-align: right;\"><span style=\"font-size: 8pt;\"><strong>pogled.ba<\/strong><\/span><\/div>\n","protected":false},"excerpt":{"rendered":"<div class=\"mh-excerpt\"><div style=\"text-align: justify;\" \/><img loading=\"lazy\" decoding=\"async\" class=\" alignleft size-full wp-image-7800\" style=\"margin-top: 3px; margin-right: 6px; float: left;\" alt=\"mhe_rijeka\" src=\"https:\/\/ljportal.com\/arhiva\/wp-content\/uploads\/2010\/11\/novo_jesen_mhe_rijeka.gif\" height=\"113\" width=\"150\" srcset=\"https:\/\/ljportal.com\/arhiva\/wp-content\/uploads\/2010\/11\/novo_jesen_mhe_rijeka.gif 150w, https:\/\/ljportal.com\/arhiva\/wp-content\/uploads\/2010\/11\/novo_jesen_mhe_rijeka-80x60.gif 80w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/>Posljednjih je godina u Bosni i Hercegovini prava ekspanzija mini hidroelektrana od kojih su neke u postupku projektiranja, drugima se dodjeljuju koncesije, a tre\u0107i su opet u procesu izgradnje. Prema nepotpunim podacima u planu je realizacija oko pet stotina mHE diljem BiH. <\/p>\n<\/div>","protected":false},"author":1,"featured_media":7800,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24],"tags":[],"class_list":["post-7801","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-gospodarstvo-gospodarstvo"],"_links":{"self":[{"href":"https:\/\/ljportal.com\/arhiva\/wp-json\/wp\/v2\/posts\/7801","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ljportal.com\/arhiva\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ljportal.com\/arhiva\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ljportal.com\/arhiva\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ljportal.com\/arhiva\/wp-json\/wp\/v2\/comments?post=7801"}],"version-history":[{"count":0,"href":"https:\/\/ljportal.com\/arhiva\/wp-json\/wp\/v2\/posts\/7801\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ljportal.com\/arhiva\/wp-json\/wp\/v2\/media\/7800"}],"wp:attachment":[{"href":"https:\/\/ljportal.com\/arhiva\/wp-json\/wp\/v2\/media?parent=7801"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ljportal.com\/arhiva\/wp-json\/wp\/v2\/categories?post=7801"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ljportal.com\/arhiva\/wp-json\/wp\/v2\/tags?post=7801"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}